Voltaria
Solar energy investment in Italy

Turnkey solar plant investment

1 MWp ground-mounted solar projects in Tuscany, Puglia and Basilicata. Every step runs through a single point of contact, from company formation and permits to EPC and commissioning.

5 MWpDevelopment portfolio
875,000 €Turnkey per MWp
Active development in 3 regions
Two people reviewing documents in front of solar panelsPAS and TICA processes under way at the Tuscany site
Why Italy

An investment case
built on numbers

1,445

kWh/kWp per year

PVsyst simulation, 700-725 Wp HJT bifacial modules, fixed mounting at 30 degrees facing south.

A row of solar panels across a meadow in bloom
88%Performance ratio (PR)
5.9 years

Simple payback

100% equity, around 150,000 € a year assuming unit revenue of 0.104 €/kWh.

Italy's wholesale power price (PUN) held between 100-110 €/MWh through 2024. With the CER community premium, a 1 MWp plant pays for itself in under six years even on the most conservative assumptions, carrying no debt and no interest.

See the investment model
End to end

From development to operation,
one point of contact

  • SPV and corporate structure

    A separate S.r.l. for each plant, bank account opening and the legal steps, all handled under power of attorney.

  • Land management

    Lease agreements, purchase options and transfer of the land once permits are in place, with perimeter fencing set to the parcel boundaries.

  • Permits and approvals

    TICA assessment, PAS application, correspondence with the municipality and taking the project to RTB status.

  • Turnkey EPC

    Site preparation, steel structure, module mounting, inverter, transformer and MV connections, testing and commissioning.

Process

10-12 months from contract
to commercial operation

1. Assessment and SPV formation

Technical, financial and legal pre-assessment, plus the CAPEX/OPEX structure. The S.r.l. is formed in two to three weeks.

Two technicians reviewing a site in front of rows of solar panels

2. Permits: PAS and TICA

Applications are filed under the SPV, and authority opinions and technical revisions are managed. Around 90 days.

A team working with documents and laptops around a meeting table

3. Grid connection and RTB

STMG application, assessment by the distribution company and the connection offer. The project reaches ready to build status.

High voltage transmission towers in evening light

4. EPC and commissioning

90 days of construction and assembly, testing and provisional acceptance. CER integration is completed through GSE.

Two technicians checking panel rows with a measuring device

Plan an investment meeting

Your details are used only to get back to you.
Portfolio

Sites under
development

All projects
Investment structure

Clear numbers,
an investment you can plan

1 MWp turnkey

Every line item from land purchase to CER integration in a single price. Figures are finalised at the offer stage.

  • Purchase price for 1 hectare of land
  • EPC: engineering, procurement and construction
  • 1,000 kVA transformer station and MV connection
  • Development, PAS and TICA permitting
  • CER integration and GSE procedures
875,000 € + VAT
Simple payback 5.9 years
Request an offer
A technician inspecting alongside rows of solar panels
Investor contact[email protected]
"The investor's only job is to decide. From company formation to permits, from land to commissioning, we run every step and report with numbers at each stage."
Amministratore Unico, Voltaria Energy S.r.l.Selçuk Arslan
Why Voltaria

Local in Italy,
familiar in Türkiye

The portfolio at a glance

Investment model
5 MWpDevelopment portfolio
3 regionsTuscany, Puglia, Basilicata
10-12 monthsContract to commercial operation
725 WpHJT bifacial module technology